Health and Safety are important in your life, there are some procedure to get this purposes. Chemical hazard and symbol, unsafe condition and unsafe action, reapeted nearmiss can lead big incident. Welding inspection, certification, hazardous waste and regulation, waste disposal company and treatment. Risk management, emergency situation, crysis management. ISO and OSHAS Procedure, Audit, Environmental Protection Law, hot job, confine space. People Protection Equipment, PPE, safety equipment.

Thursday, February 11, 2010

Alarm System

Alarm system/warning to all fire fighting team is perform with the siren sound or using pager notification.

Alarm For Fire Fighting Team

1.PUSH BOTTON 1



Sound long : 3 x 15 second
Time interval : 2 x 7 second
Alarm sign can be repeated if needed.
Action: Fire Fighting Team must come in the fire fighting station or fire fighting center.

TEST – Siren Sound

2. PUSH BOTTON 2


Alarm testing in the plant should be done because, every time on emergency condition needed, alarm sound is not died. This testing do every Saturday on the 12:00 noon.

Testing done for 15 second, for make sure the function is normal.
Protection Alarm for Civil

3. PUSH BOTTON 3


Warning!

Time duration is 3 minutes with constant sound.

“Danger Come Closer”

Action: Turn on the radio, follow the instruction and prepare for protection alarm.

4. PUSH BOTTON 4

Alarm








Sound Duration for 1 minute with up and down tone as the drawing above.

“Direct Danger“

Action: Follow the instruction and act as advise, go to the safe area, bring all emergency stuff and emergency radio with battery. Listen to the next instruction.


5. PUSH BOTTON 5

Warning End




1 minute with constant tone

“Ending of Danger”
Action: Listen to the next instruction.

Related Article: Implementation of Safety System

No comments:

Post a Comment